The Minister of Works, Engr. David Umahi has carried out an inspection of Sections One and Two of the Abuja–Kaduna–Kano Road project, reaffirming the Federal Government’s commitment to delivering durable infrastructure to Nigerians.
Assistant Director, Press and Public Relations of the Ministry, Clement Ezeorah announced this in a statement on Saturday.
Speaking during the inspection today 20th September, 2025, the Minister noted that the quality of work so far was commendable.
He reaffirmed the commitment of the Tinubu- led administration to delivering durable road infrastructure that will stand the test of time. “We are constructing roads that will last for 100 years — roads designed with modern engineering standards, durability, and sustainability in mind. These projects are for the future of our children and the prosperity of our nation”, Umahi said.
The Minister of State for Works, Mohammed Goronyo stated that the Abuja–Kaduna–Kano Road was one of Nigeria’s most strategic transport corridors, linking major cities, facilitating trade, and enhancing the movement of people and goods across the North and beyond. The Federal Ministry of Works therefore reiterated its resolve to deliver a world-class, durable road that will stand the test of time.
Accompanying the Minister, the Director of Highways, Construction and Rehabilitation, Engr. Clement Ogbuagu, acknowledged that while good progress had been made on Section One, some delays persist, particularly in Section Two where only about 3% completion has been achieved against a 40% target. He emphasized the need for contractors to deploy more equipment to meet delivery timelines.
Engineer Representing Works on the construction of Abuja-Kaduna- Highway, Engr. Chukwuma Kalu disclosed that Section One, which covers 40.5km (dual carriage on concrete pavement), had recorded significant progress.
Of the total stretch, 22km have been completed on both sides, with work actively ongoing on other portions. He further noted that the 17.3km Kano section and the 6.63km dual carriage airport access road have both achieved major milestones, with the airport road already completed and awaiting commissioning.




