Power

TCN To Investigate Partial Grid Collapse

By Sunday Etuka, Abuja

The Transmission Company of Nigeria (TCN) has hinted on plans to investigate the cause of the partial grid collapse which occurred on Monday leading to nationwide blackout.

TCN’s General Manager, Public Affairs, Mrs Mbah who disclosed this in a statement on Tuesday said, the investigation would
be carried out as soon as the grid is fully restored.

Mrs Miah explained that the
national grid experienced a partial disturbance, on Monday, 14th October, 2024 at about 6:48pm, noting that efforts to fully recover the grid is still ongoing.

- Advertisement -

She said, although the recovery of the grid commenced immediately, with Azura power station providing the blackstart, grid recovery reached advanced stages at about 10.24am, today when it encountered a challenge that caused a slight setback in the recovery process.

The GM said, the slight setback notwithstanding, TCN continued with the grid recovery process, which has reached an advanced stage, ensuring bulk power availability to about 90% of its substations nationwide.

According to her, supply has been restored to the Abuja axis and other major distribution load centers nationwide.

However, she noted that the partial disturbance did not affect the Ibom Gas generating station which was islanded from the grid yesterday, and continued to supply areas in the South Southern part of the country such as Eket, Ekim, Uyo, and Itu 132kV transmission Substations during the period.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button